{"id":350,"date":"2012-03-13T03:00:27","date_gmt":"2012-03-13T03:00:27","guid":{"rendered":"http:\/\/www.eaglemat.com\/blog\/?p=350"},"modified":"2012-03-12T14:29:26","modified_gmt":"2012-03-12T14:29:26","slug":"2012-leed-policy-changes-to-watch","status":"publish","type":"post","link":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/","title":{"rendered":"2012 LEED Policy Changes to Watch"},"content":{"rendered":"<p><a href=\"http:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-352\" style=\"float: left; margin: 0px 7px 0px 7px;\" title=\"2012 LEED Policy Changes to Watch\" src=\"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/2012-LEED-Policy-Changes-to-Watch1-231x300.jpg\" alt=\"2012 LEED Policy Changes to Watch\" width=\"231\" height=\"300\" srcset=\"https:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/2012-LEED-Policy-Changes-to-Watch1-231x300.jpg 231w, https:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/2012-LEED-Policy-Changes-to-Watch1.jpg 364w\" sizes=\"(max-width: 231px) 100vw, 231px\" \/><\/a>As covered last week, the <a title=\"2012 LEED Comment Period\" href=\"http:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\">2012 LEED Comment Period<\/a> has officially opened and feedback from Green builders, contractors, and policymakers is highly encouraged.\u00a0 As part of our awareness initiative, the <a title=\"Eagle Mat Blog\" href=\"http:\/\/www.eaglemat.com\/blog\/\">Eagle Mat Blog<\/a> is proud to share this list of changes to watch in 2012.\u00a0 All readers are encouraged to visit the USGBC on the Web to officially submit comments on these proposed changes, and more, before policy updates are finalized this November.\u00a0 This March marks an opportunity to have a significant impact on the future of the LEED program, and we welcome readers to visit our article on <a title=\"LEED certification requirements\" href=\"http:\/\/www.eaglemat.com\/blog\/leed-certification-an-introduction-to-sustainable-building\">LEED certification requirements<\/a> to learn more about current policy and general program details prior to casting comments.<\/p>\n<p>As Mr. Scott DeGaro explains on the green-buildings.com blog, the goal of the USGBC is to \u201cevolve the rating systems until LEED Certification also implies a neutral or positive environmental impact,\u201d (i).\u00a0 This is an important concept to understand; it is no longer satisfactory to minimize a project\u2019s impact on the environment.\u00a0 Rather, the end goal is to eventually have LEED certified projects and communities <em>better<\/em> the environment.\u00a0 The LEED program is designed to accomplish this end goal by serving as a dynamic framework that facilitates sustainability at all stages of the project life cycle.\u00a0 Periodically fielding and using public opinion to shape policy changes is an integral part of the process, and all interested parties are encouraged to take advantage.<\/p>\n<h2>LEED 2012:\u00a0 Policy Changes to Watch<\/h2>\n<p>\u201cStringent\u201d is a word commonly associated with the proposed LEED program updates for 2012.\u00a0 Indeed, the LEED program is beginning to tighten requirements for accreditation in several areas.\u00a0 This arguably produces more sustainable \u201cGreen\u201d projects, however it also requires participants to pay closer attention to the ways in which the LEED program is evolving.\u00a0 The following is a short list of notable policy changes for 2012.\u00a0 Readers may visit the USGBC online for additional 2012 changes and public comments (ii).<\/p>\n<p><strong>1. Establishment of credit<\/strong>:\u00a0 In what may be the most significant change for 2012, LEED project teams must submit a formal explanation of the means in which a credit will be attained, managed, and sustained.\u00a0 The most common example would be for a project team to create an official methodology for \u201cestablishing\u201d and maintaining the instrument (or process) that awards the credit.<\/p>\n<p><strong>2. Performance evidence.\u00a0<\/strong> Another important change to LEED fundementals, the inclusion of a \u201cPerformance\u201d component in 2012 requires that project management document the activity that awards the LEED credit.\u00a0 This may include in-house testing, audits, or other means of information gathering that evidence the existence of the instrument (or process) and the impact it has on overall performance.<\/p>\n<p><strong>3.\u00a0 Increased Minimum Energy Efficiency.<\/strong>\u00a0 A notable change to the Energy and Atmosphere portion of the LEED program includes upping the Energy Star rating for ratable buildings be 75 or higher.<\/p>\n<h2>More Information on LEED<\/h2>\n<p>The LEED (Leadership in Energy and Environmental Design) program is designed to award Earth-conscious projects with profit-enhancing incentives, both commercial and residential.\u00a0 Most notably, the program has been built to \u201cidentify and implement\u201d sustainable practices throughout the project life cycle.\u00a0 The program is dynamic in this way and welcomes policy updates as new technologies, research, and maintenance solutions become available.<\/p>\n<p>A <a title=\"commercial floor mat\" href=\"http:\/\/www.eaglemat.com\">commercial floor mat<\/a> and property management company, Eagle Mat stands committed to helping LEED project managers, Green builders, and eco-friendly developers find products that achieve program credits, performance requirements, and other end goals.\u00a0 Our customer service team is available at <strong>877-333-1018<\/strong> to assist in product selection and consultation.<\/p>\n<p>&nbsp;<\/p>\n<p>(i) http:\/\/www.green-buildings.com\/content\/781729-leed-2012<\/p>\n<p>(ii) http:\/\/www.usgbc.org\/DisplayPage.aspx?CMSPageID=2521<\/p>\n","protected":false},"excerpt":{"rendered":"<a href=\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\"><img width=\"150\" height=\"150\" src=\"https:\/\/www.eaglemat.com\/blog\/wp-content\/plugins\/thumbnail-for-excerpts\/tfe_no_thumb.png\" class=\"alignleft wp-post-image tfe\" alt=\"\" title=\"\" \/><\/a><p>As covered last week, the 2012 LEED Comment Period has officially opened and feedback from Green builders, contractors, and policymakers is highly encouraged.\u00a0 As part of our awareness initiative, the Eagle Mat Blog is proud to share this list of changes to watch in 2012.\u00a0 All readers are encouraged to visit the USGBC on the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[135,150,86],"tags":[5,286,156,187,285,288,284,290,287,289,249],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.6.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>2012 LEED Policy Changes to Watch<\/title>\n<meta name=\"description\" content=\"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2012 LEED Policy Changes to Watch\" \/>\n<meta property=\"og:description\" content=\"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\" \/>\n<meta property=\"og:site_name\" content=\"Eagle Mat Blog\" \/>\n<meta property=\"article:published_time\" content=\"2012-03-13T03:00:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2012-03-12T14:29:26+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/2012-LEED-Policy-Changes-to-Watch1-231x300.jpg\" \/>\n<meta name=\"author\" content=\"Eagle Mat &amp; Floor Products\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eagle Mat &amp; Floor Products\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\",\"url\":\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\",\"name\":\"2012 LEED Policy Changes to Watch\",\"isPartOf\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#website\"},\"datePublished\":\"2012-03-13T03:00:27+00:00\",\"dateModified\":\"2012-03-12T14:29:26+00:00\",\"author\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c\"},\"description\":\"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.eaglemat.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2012 LEED Policy Changes to Watch\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#website\",\"url\":\"https:\/\/www.eaglemat.com\/blog\/\",\"name\":\"Eagle Mat Blog\",\"description\":\"Powered by Eagle Mat | Step Forward\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.eaglemat.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c\",\"name\":\"Eagle Mat &amp; Floor Products\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g\",\"caption\":\"Eagle Mat &amp; Floor Products\"},\"sameAs\":[\"https:\/\/www.eaglemat.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2012 LEED Policy Changes to Watch","description":"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/","og_locale":"en_US","og_type":"article","og_title":"2012 LEED Policy Changes to Watch","og_description":"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.","og_url":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/","og_site_name":"Eagle Mat Blog","article_published_time":"2012-03-13T03:00:27+00:00","article_modified_time":"2012-03-12T14:29:26+00:00","og_image":[{"url":"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/2012-LEED-Policy-Changes-to-Watch1-231x300.jpg"}],"author":"Eagle Mat &amp; Floor Products","twitter_misc":{"Written by":"Eagle Mat &amp; Floor Products","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/","url":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/","name":"2012 LEED Policy Changes to Watch","isPartOf":{"@id":"https:\/\/www.eaglemat.com\/blog\/#website"},"datePublished":"2012-03-13T03:00:27+00:00","dateModified":"2012-03-12T14:29:26+00:00","author":{"@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c"},"description":"Exclusive update on upcoming 2012 LEED policy changes. Join the Eagle Mat Blog to learn more about LEED programs and upcoming policy changes for 2012.","breadcrumb":{"@id":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.eaglemat.com\/blog\/2012-leed-policy-changes-to-watch\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eaglemat.com\/blog\/"},{"@type":"ListItem","position":2,"name":"2012 LEED Policy Changes to Watch"}]},{"@type":"WebSite","@id":"https:\/\/www.eaglemat.com\/blog\/#website","url":"https:\/\/www.eaglemat.com\/blog\/","name":"Eagle Mat Blog","description":"Powered by Eagle Mat | Step Forward","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eaglemat.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c","name":"Eagle Mat &amp; Floor Products","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g","caption":"Eagle Mat &amp; Floor Products"},"sameAs":["https:\/\/www.eaglemat.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts\/350"}],"collection":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/comments?post=350"}],"version-history":[{"count":0,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts\/350\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/media?parent=350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/categories?post=350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/tags?post=350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}