{"id":340,"date":"2012-03-07T11:13:56","date_gmt":"2012-03-07T11:13:56","guid":{"rendered":"http:\/\/www.eaglemat.com\/blog\/?p=340"},"modified":"2012-03-07T11:19:39","modified_gmt":"2012-03-07T11:19:39","slug":"time-for-change-2012-leed-comment-period-has-opened","status":"publish","type":"post","link":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/","title":{"rendered":"Time for Change:  2012 LEED Comment Period Has Opened"},"content":{"rendered":"<p><a href=\"http:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-342\" style=\"float: left; margin: 0px 7px 0px 7px;\" title=\"Time for Change 2012 LEED Comment Period Has Opened\" src=\"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/Time-for-Change-2012-LEED-Comment-Period-Has-Opened-300x203.jpg\" alt=\"Time for Change 2012 LEED Comment Period Has Opened\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/Time-for-Change-2012-LEED-Comment-Period-Has-Opened-300x203.jpg 300w, https:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/Time-for-Change-2012-LEED-Comment-Period-Has-Opened.jpg 503w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>The 2012 LEED Comment Period has officially begun!\u00a0 All interested parties are invited to join the <a onclick=\"target='_blank'\"  title=\"USGBC\" href=\"http:\/\/www.usgbc.org\">USGBC<\/a> online to review and comment on proposed changes to 2012 LEED certification policies.\u00a0 Though official changes will not be announced until November 7<sup>th<\/sup>, the USGBC has provided an overview of the areas that are on the table for revision.<\/p>\n<p>It is important for all Green builders and LEED projects to stay-in-step with these issues as they may change before year\u2019s end.\u00a0 As a reminder, the 2012 LEED Comment Period works as follows:<\/p>\n<p>1. Proposed changes are made available online via the USGBC website.<\/p>\n<p>2. The official comment period begins March 1<sup>st<\/sup>, 2012.\u00a0 At this point, all interested parties are invited to log on to the USGBC website to review and comment on areas facing proposed change.<\/p>\n<p>3. Guests are asked to please send all comments in a single submission.<\/p>\n<p>4. All areas of change, along with all user-submitted comments, will be presented before a panel in August.<\/p>\n<p>5. Panel members will weigh proposed policy changes with all submitted comments, and the official 2012 LEED policy is planned to be announced on November 7<sup>th<\/sup>.<\/p>\n<h2>Areas of Change:\u00a0 Things to Watch in 2012<\/h2>\n<p>There is a lot to be excited about this summer as policymakers gather to determine how sustainable building practices may be implemented with greater global effectiveness.\u00a0 Readers who are new to the concept of LEED and sustainable building are encouraged to read our article on <a title=\"LEED Certification Requirements\" href=\"http:\/\/www.eaglemat.com\/blog\/leed-certification-an-introduction-to-sustainable-building\">LEED Certification Requirements<\/a> for a basic overview of the LEED system, process, and goals.<\/p>\n<p>The USGBC has announced the proposal of changes in the following areas:<\/p>\n<p><strong>1. Building Design and Construction:\u00a0<\/strong> It has been proposed that the rating system for Building Design &amp; Construction be more \u201cstringent\u201d for data centers, warehouses, hospitals, and distribution centers seeking accreditation.<\/p>\n<p><strong>2. Interior Design and Construction:<\/strong>\u00a0 The rating system for Interior Design &amp; Construction likewise faces pressure for strict reform.\u00a0 New policy lobbies for greater \u201ctechnical stringency across all credit categories\u201d for those projects seeking LEED system compliance.<\/p>\n<p><strong>3. Operations and Maintenance (Existing Buldings):<\/strong>\u00a0 The Operations &amp; Maintenance rating system is under scrutiny as well.\u00a0 As it stands, the rating system implements design focused strategies that may not necessarily be controllable by a particular facility\u2019s in-house management team.\u00a0 Now, policymakers are lobbying to refocus requirements for ongoing building efficiency so that internal management teams may have a greater degree of control.<\/p>\n<p><strong>4.\u00a0 Residential Development:\u00a0<\/strong> New proposals suggest that the rating system requirements for Neighborhood Development be split into two distinct classes.\u00a0 The first division is to be called <strong>LEED-ND Plan<\/strong> and, as the name suggests, it focuses on the stages of planning that precede project development.\u00a0 The second division, <strong>LEED-ND<\/strong>, focuses exclusively on subsequent development stages.\u00a0 It is hoped that dividing projects according to where they stand in the planning\/development cycle will better communicate what it means to be \u201ccertified.\u201d<\/p>\n<p>As a reminder, all documents containing proposed changes and comments are available for download on the USGBC website.<\/p>\n<h2>Stay in Touch with the Eagle Mat Blog<\/h2>\n<p>Readers are invited to join the <a title=\"Eagle Mat Blog\" href=\"http:\/\/www.eaglemat.com\/blog\/\">Eagle Mat Blog<\/a> as we document the 2012 Comment Period this March.\u00a0 Our weekly updates will keep you in-the-know policy changes are proposed, discussed, and poised for inclusion in the 2012 LEED program. We will also provide <a title=\"commercial floor mat\" href=\"http:\/\/www.eaglemat.com\">commercial floor mat<\/a> recommendations for LEED certified projects, including <a title=\"eco-friendly mats\" href=\"http:\/\/www.eaglemat.com\/eco-friendly-mats.html\">eco-friendly mats<\/a> that award LEED credits!<\/p>\n<p>&nbsp;<\/p>\n<p>Source for this article:\u00a0 http:\/\/www.usgbc.org\/DisplayPage.aspx?CMSPageID=2601<\/p>\n","protected":false},"excerpt":{"rendered":"<a href=\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\"><img width=\"150\" height=\"150\" src=\"https:\/\/www.eaglemat.com\/blog\/wp-content\/plugins\/thumbnail-for-excerpts\/tfe_no_thumb.png\" class=\"alignleft wp-post-image tfe\" alt=\"\" title=\"\" \/><\/a><p>The 2012 LEED Comment Period has officially begun!\u00a0 All interested parties are invited to join the USGBC online to review and comment on proposed changes to 2012 LEED certification policies.\u00a0 Though official changes will not be announced until November 7th, the USGBC has provided an overview of the areas that are on the table for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[135,150],"tags":[5,286,156,187,285,288,284,290,287,289,249],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.6.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Time for Change: 2012 LEED Comment Period Has Opened<\/title>\n<meta name=\"description\" content=\"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Time for Change: 2012 LEED Comment Period Has Opened\" \/>\n<meta property=\"og:description\" content=\"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\" \/>\n<meta property=\"og:site_name\" content=\"Eagle Mat Blog\" \/>\n<meta property=\"article:published_time\" content=\"2012-03-07T11:13:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2012-03-07T11:19:39+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/Time-for-Change-2012-LEED-Comment-Period-Has-Opened-300x203.jpg\" \/>\n<meta name=\"author\" content=\"Eagle Mat &amp; Floor Products\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eagle Mat &amp; Floor Products\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\",\"url\":\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\",\"name\":\"Time for Change: 2012 LEED Comment Period Has Opened\",\"isPartOf\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#website\"},\"datePublished\":\"2012-03-07T11:13:56+00:00\",\"dateModified\":\"2012-03-07T11:19:39+00:00\",\"author\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c\"},\"description\":\"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.eaglemat.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Time for Change: 2012 LEED Comment Period Has Opened\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#website\",\"url\":\"https:\/\/www.eaglemat.com\/blog\/\",\"name\":\"Eagle Mat Blog\",\"description\":\"Powered by Eagle Mat | Step Forward\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.eaglemat.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c\",\"name\":\"Eagle Mat &amp; Floor Products\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g\",\"caption\":\"Eagle Mat &amp; Floor Products\"},\"sameAs\":[\"https:\/\/www.eaglemat.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Time for Change: 2012 LEED Comment Period Has Opened","description":"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/","og_locale":"en_US","og_type":"article","og_title":"Time for Change: 2012 LEED Comment Period Has Opened","og_description":"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.","og_url":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/","og_site_name":"Eagle Mat Blog","article_published_time":"2012-03-07T11:13:56+00:00","article_modified_time":"2012-03-07T11:19:39+00:00","og_image":[{"url":"http:\/\/www.eaglemat.com\/blog\/wp-content\/uploads\/2012\/03\/Time-for-Change-2012-LEED-Comment-Period-Has-Opened-300x203.jpg"}],"author":"Eagle Mat &amp; Floor Products","twitter_misc":{"Written by":"Eagle Mat &amp; Floor Products","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/","url":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/","name":"Time for Change: 2012 LEED Comment Period Has Opened","isPartOf":{"@id":"https:\/\/www.eaglemat.com\/blog\/#website"},"datePublished":"2012-03-07T11:13:56+00:00","dateModified":"2012-03-07T11:19:39+00:00","author":{"@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c"},"description":"The 2012 LEED Comment Period has officially begun. Visit the Eagle Mat Blog to stay in touch with LEED changes for 2012.","breadcrumb":{"@id":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.eaglemat.com\/blog\/time-for-change-2012-leed-comment-period-has-opened\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eaglemat.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Time for Change: 2012 LEED Comment Period Has Opened"}]},{"@type":"WebSite","@id":"https:\/\/www.eaglemat.com\/blog\/#website","url":"https:\/\/www.eaglemat.com\/blog\/","name":"Eagle Mat Blog","description":"Powered by Eagle Mat | Step Forward","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eaglemat.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/3740ba6e69852940243e2ab35917123c","name":"Eagle Mat &amp; Floor Products","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eaglemat.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/20168d8f7c55179c8d6481134d629861?s=96&d=mm&r=g","caption":"Eagle Mat &amp; Floor Products"},"sameAs":["https:\/\/www.eaglemat.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts\/340"}],"collection":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/comments?post=340"}],"version-history":[{"count":0,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/posts\/340\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/media?parent=340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/categories?post=340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eaglemat.com\/blog\/wp-json\/wp\/v2\/tags?post=340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}